Houston, Texas · Water infrastructure construction Established in the 1990s

General contracting · Greater Houston

Building the infrastructure communities rely on.

For more than three decades, JTR Constructors, Inc. has served the Houston region with construction expertise in water and wastewater facilities.

Illustrative facility image

Who we are

Decades of experience across essential water infrastructure.

JTR Constructors, Inc. is a Houston-based general contractor with more than three decades of experience supporting water and wastewater infrastructure for municipalities and utility districts across Greater Houston and Southeast Texas.

Its documented project record includes prime-contractor and specialty roles on effluent-reuse systems, reverse-osmosis construction, water-supply improvements, odor mitigation, and wastewater-treatment plant upgrades—work grounded in field coordination, constructability, and the demands of operating public facilities.

Established experience 30+ years Active in the Texas construction market since the 1990s
Public-owner work Municipal + MUD Documented work for cities and municipal utility districts
Infrastructure focus Water + wastewater Supply, treatment, reuse, and process systems

What we build

Construction for critical water systems.

From new facilities to improvements at operating sites, JTR supports the construction needs of public infrastructure owners and project teams.

An 18-second illustration of wastewater infrastructure: pumping and headworks, aeration, clarification, UV treatment, electrical controls and solids handling. The system transforms into the JTR Constructors, Inc. logo. No audio. Select the video to play, pause or replay; keyboard users can press Enter or Space.
01 / FACILITIES

Wastewater treatment

Plant construction, rehabilitation, and expansion work supporting treatment capacity and long-term operations.

02 / SYSTEMS

Water facilities

Construction and improvement work for facilities that serve municipal and utility district water systems.

03 / DELIVERY

General contracting

Coordination of construction activities, specialty trades, procurement, site execution, and project closeout.

How we work

Built around the demands of active infrastructure.

Water facilities require careful sequencing, coordination among trades, and attention to operational constraints. Our approach centers on practical planning and clear communication throughout construction.

From early coordination through turnover, the focus stays on constructability, safety, quality, and the needs of the owner.

Project priorities

  • Field coordination and constructability
  • Safety and quality at each phase
  • Clear communication with project teams
  • Reliable execution and closeout

Integrated project scope

Coordinated construction across the systems that keep facilities operating.

JTR brings civil, mechanical, electrical, and field activities into one coordinated delivery plan—sequenced around safety, constructability, facility operations, and turnover.

Construction professional inspecting large-diameter pipeline installation
01 / Pipeline systems

Pipeline & process piping

Large-diameter piping, process connections, valves, tie-ins, and underground utility coordination.

Electrical technician inspecting industrial power distribution equipment
02 / Electrical systems

Power, controls & instrumentation

Power distribution, conduit, controls, panels, instrumentation interfaces, and equipment power coordination.

Temporary industrial pump and hose equipment prepared for field operation
03 / Bypass operations

Temporary flow management

Temporary pumping, hoses, isolation, flow control, and sequenced tie-ins that support continuous facility operations.

Construction crew placing and leveling concrete at an active jobsite
04 / Concrete construction

Foundations & structures

Foundations, slabs, walls, equipment pads, embeds, and rehabilitation supporting civil and process systems.

Construction team coordinating work in the field
05 / Field construction

Site execution & coordination

Site logistics, excavation, earthwork, access, safety, subcontractor coordination, and day-to-day field execution.

Technician working on industrial piping and mechanical equipment
06 / Mechanical systems

Process equipment integration

Pumps, process equipment, piping assemblies, valves, supports, alignment, startup, and commissioning coordination.

Our process

Disciplined from planning to turnover.

Each project calls for a team that understands how construction decisions affect the facility, schedule, and people who operate it.

01 / ALIGN

Define the work

Review scope, constraints, drawings, and operational requirements with the project team.

02 / PLAN

Sequence delivery

Coordinate subcontractors, materials, access, and construction milestones.

03 / BUILD

Execute in the field

Manage work with an emphasis on safety, quality, and timely decisions.

04 / CLOSE

Support turnover

Complete punch items, documentation, and the transition to operations.

Verified public experience

Selected work documented by public owners.

Public records document JTR in prime-contractor and specialty roles across water and wastewater infrastructure. Each selection below identifies the recorded role, status, and source.

2023–2025 record Water supply

Water Supply System Improvements

City of Port Lavaca · Calhoun County, Texas

City documents name JTR as contractor and describe distribution-system connections, ductile-iron piping, booster pumps, valves, and motor-operated valves.

Recorded role
Prime contractor
Contract after CO 4
$4,321,350
View public record
2023–2024 Wastewater treatment

Joint Plant Odor Mitigation

Reid Road Municipal Utility District Nos. 1 & 2 · Harris County, Texas

District minutes record the award to JTR and later authorization of the ninth and final pay estimate, subject to operator confirmation of continued blower operation.

Recorded role
Prime contractor
Recorded award
$737,500
View public record
2016–2018 Water treatment

Reverse Osmosis System Construction

Brazoria County Municipal Utility District No. 21 · Brazoria County, Texas

District records document notice to proceed, final inspection, and the tenth and final pay estimate for JTR's reverse-osmosis system construction.

Recorded role
Prime contractor
Recorded milestone
Final inspection and pay
View public record
2008 Accepted by owner

Westway Wastewater Treatment Plant Improvements

City of Houston · Houston Public Works

The City of Houston agenda record accepts JTR's work and reports a final contract amount 2.77% below the original contract.

Recorded role
Prime contractor
Final contract
$563,756.50
View public record
2019 Specialty participation

69th Street WWTP Improvements — Package 6

City of Houston · Prime contractor: CSA Construction

The City record lists JTR for wastewater-treatment-plant equipment within a broader program involving filtration, pumps, electrical systems, instrumentation, concrete, piping, sensors, and valves.

Recorded role
WWTP equipment subcontractor
Recorded participation
$734,185
View public record

This is a selected record, not a complete project list. Contract amounts, roles, and statuses are reported from the linked public documents; the applicable owner records and executed agreements control.

Business inquiries

Connect with JTR.

Use this form for project opportunities, bid invitations, supplier introductions, subcontractor qualifications, engineering coordination, or public-sector inquiries.

Houston office (281) 550-7107

Request Form

Provide the information below so JTR can route your request appropriately. Fields marked with an asterisk are required.

Use an authorized secure link. Do not include passwords in this form.
Any file type is accepted. You may select multiple files, up to 10 MB total. No documents selected.

Protected by spam screening.

Do not submit confidential, export-controlled, classified, personal financial, or protected procurement information through this form. JTR will review the request before requesting additional documents.